contact us
+86 137 2493 5495
kingoals@hotmail.com
+86-757-85622500
# 5, Yonghe Industrial Park, Shishan Town, Nanhai Dist. Foshan City, Guangdong Prov. China.
Industry News

Installation for T-Shape Transition Strips

Step 1: Select proper profile of transition strips according to width of the gap or thinkness of the floor material to be covered.
Step 2: Keep the gap clean without obstruction that would cover the shape from setting level on the flooring material.
Step 3: Fill the gap with a silicone or grout and be careful not to overfill the gap.
Step 4: Insert the anchoring leg into the gap and be partially buried in the sealant. the edges of the profile rest on the edges of the flooring material and covering the gap.
Step 5: Slightly position the profile to be straight.
Step 6: Do forget to remove any remaining sealant or grout after installation.
Skype
Email
QQ
WeChat
TOP